July 2018

The steel frame for the Eastern block is erected and completed on deep piles with flooring concrete slabs to first and second floors. Specification continues on final flooring finishes, glazing and balustrades, plus the lifts brief. Surface water culverts have been diverted and services provided for. The two street lamps on the pavement in the High Street have been relocated on the opposite side of the road.